Well looking at this thread it's been about 2 years since I touched the lay out. It's just been setting being used as a flat surface for junk and dust.
But I moved it back over to the "work" area of the basement.
Last night I pinned the track in place. The double loop is the mainstay of the layout. The inner and outer spurs and turnouts are still up for debate in my head.
Tonight I traced the track for prep in laying road bed. I found this sharpie works well for tracing the track. Place the end of the gray part on the rail and follow around and it's the perfect distance for the road bed I'm using.



Sent from my Pixel 6 using Tapatalk